Archive for December, 2013

Envelope Manufacture Case Study

24th December 2013

Sector: Envelope Manufacture

Client Description: Part of a UK group

Problem: The existing window patching product was running dirty at the speeds they wanted to run at leading to an unacceptable down time or reduced line speed.

Our Process: We undertook our standard audit, taking a series of paper and adhesive samples

Solution: Our specialist team designed a new window patching product that enabled a reduction in consumption of 10% and an increased line speed of 20 % with clean running and so minimised down time.